The Mema Boy

The Mema Boy
Jabonga Jabonga

Search This Blog

LABELS

Showing posts with label MAP. Show all posts
Showing posts with label MAP. Show all posts

Thursday, October 1, 2020

SLEX TOLL ROAD 4 (TR-4)

 SOUTH LUZON EXPRESSWAY (SLEX) TOLL ROAD 4 (TR-4)

Construction Schedule:

  • 2019-2022
  •  


    Project Description: 
    • A new four (4)-lane toll road from Sto. Tomas, Batangas to Tayabas/Lucena City in Quezon, 66.74 km. long

    ==

    ref:        https://www.dpwh.gov.ph/dpwh/PPP/projs/tr4                                  

Thursday, September 12, 2019

SLEX Toll Road 4

with due respect sa lahat ng presidente na inabot ko, in terms of accomplishment..truly President Duterte is the best president we ever have/ we ever had.. pag ang leader talaga ay decisive at strong at me matinding political will, kahit pa medyo masama ang bunganga..lahat ng projects na matagal ng delayed is nasisimulan at natatapos.. hopefully our next president will be as strong, as decisive, with the same politcal will as Duterte #duterte #buildbuildbuild #dpwh


c= map from DPWH

C-6 EXPRESSWAY

c= map from DPWH

NLEX-SLEX Connector Road





CAVITE BATANGAS Expressway (CTBEX) MAP

CALAX MAP


c= Map taken from www.southforbes.com

Sponsor

Sponsor
Soldering, ESD safe items, Measuring Tools, Magnifier, Microscope